Units stay dry
Active interior leaks dictate tarp order before cosmetic dents are discussed.
After a Cabarrus storm, Kannapolis owners need dry rooms tonight and a honest map for permanent work tomorrow. Alley staging and duplex access shape how fast tarps go up.

Say when water is crossing a ceiling on the form. Tarps anchor to rafters on the wet slope, not loose weights on slick tabs.
Hail can pepper alley gutters while the street-side field looks fine. Every elevation gets walked, not only where you noticed granules.
Crushed leaders dump water against brick porches. Edge repairs ride in the same plan as bruised shingles.
Limbs across duplex valleys are photographed before anyone drags them off so bark does not scratch intact courses.
Wind can peel starter at a breezeway while the main ridge looks untouched from the sidewalk.
Material lead times are written plainly when permanent shingles wait on order.
Attic wet spots and room stains get plain captions for any claim you pursue.
Alley garages and backyard shops share the walk when they were in the hail swath.
Shift workers away at the plant can still receive photos the same day covers go up.
Shared porches between units get protection when either side is taking water.
Roofing Lake Norman sequences visits. Kaliber Roofing crews secure the opening and return for approved rebuild work.
China Grove-bound owners can list a backup contact when storm week overlaps harvest travel.
Covers are rechecked when back-orders delay shingles.
Post-storm gutter flushes stop dams that cause a second leak at the eave.
Sidewalk tarps on West Avenue are walked around foot traffic when possible.
Hand-carry labor is listed when alley trucks cannot reach the eave.
You keep the emergency photo set through final install.
Plant shift changes are noted when alley access must stay clear for worker parking.
Weekend tarps are rechecked when owners travel to the lake after a Friday storm.
Active interior leaks dictate tarp order before cosmetic dents are discussed.
Elevations hidden from the street still get checked for creased tabs and dented metals.
Bent gutter runs are quoted with field damage so runoff does not repeat the leak.
Yes until crews document limb weight and secure any active leak.
The plan states plainly when only one face needs work.
Note new stains on the form. Photos layer onto the existing record.
Crews document, then remove safely without dragging bark across repair zones.
When safe, yes. Active leaks still get covered first if rain is forecast the same day.
Note interior water on the estimate form.